Construction
- August
2000 (Ext. Int. Furniture)
- July
2000 (Atrium, Preservation)
- June
2000 (Interior)
- May
2000 (Exterior)
- April
2000 (Grand Staircase, Interior)
- March
2000 (Exterior, Furniture)
- February
2000 (Screens, Frames, Racks)
- January
2000 (Stacks, Escalator)
- December
1999 (Drywall, Frames, Columns)
- November
1999 (Drywall, Framing, Concrete)
- October
1999 (Zinc Plating, Hydronic Piping, Ceiling Soffits)
- September
1999 (Elevations, Window Walls)
- August
1999 (Clerestory Ceiling, Central Staircase)
- July
1999 (Elevations, Zinc Siding, ASRS)
- June
1999 (ASRS Racks/Bins, Block Wall Veneer)
|
- May
1999 (Elevations, Siding, Windows)
- April
1999 (ASRS area) (more ASRS)
- March
1999 (Block Wall, Floors)
- February
1999 (North and West Elevations)
- January
1999 (External Walls)
- December
1998 (Pouring Columns, Slabs, Decking)
- Topping
Off Ceremony (November 10, 1998) Final Truss
- November
1998 , Emergency Staircase, Fire Retardent, Steel Beams,
Steel Deck)
- October
1998 (Steel Columns, Cellular Deck)
- September
1998 (Pouring slabs, ASRS floor preparation)
- August
1998 (slab on grade, foundation excavation)
- July
1998 (Rebar, ASRS excavation, Waterproof membrane)
- June
1998 (Stem wall, copper grounding, Pad preparation, Escalator
and Elevator frame pits)
- May
1998 (Footings, Type II Grade)
- April
1998 (Pad Compaction, Storm drains, Sewer lines, Conduits)
- Groundbreaking
(Parking lot cleared and fenced. Ceremongy with President Harter and
Christina Hixson)
|